Springwood Box Culverts
JOB DETAILS
Installing twin 1200 box culverts along the M1 at Springwood.
THE CHALLENGE
Box culverts clashing with high clears causing installation difficulties.
Very tight area for building box’s onsite.
THE SOLUTION
We fabricated struts to accommodate the odd internal measurements required to avoid clash with culverts and High Clear Posts.
We delivered panels with high clear posts attached to make building these easier and quicker onsite.